Nortel Networks DCT1900 User Manual

Page 237

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Base Station – KRC 101 1371

Install-DCT1900/R8/mw

16-15

© 2000-2005

Caution: Mounting Arms of 12" and 18" are provided. The "creative" use of longer mounting
arms is NOT ALLOWED as considerable forces could be generated due to combinations of
housing weight, length of the mounting arm, wind loading, earthquakes and/or vibration.
These forces could result in pulling out the mounting anchors from the building with destructive
results including falling hardware, including possible injury or death to people below.

6.

Complete the Installation of the Base Station
After securing the weatherproof housing to the building surface (above), terminate the signal/
power cable inside the housing with the recommended Modular Plug(s), leaving a service-loop
of approximately 12". Connect the Modular Plug(s) to the DCT1900 Base Station and install it
in the housing by hanging it on the bracket already mounted inside the housing from earlier
steps.

After verification of operation, secure the hinged door of the weatherproof housing.

Fig. 16-13 Base Station Mounting Bracket Attachment to Housing

4.0"

5.0"

Locate Base Station
Mounting Bracket
where shown and
drill .156 dia.
mounting holes.

6-32

Locking

hex-nut

6-32 x 5/8"

pan head

screw

Weatherproof Housing

(rear view)

Mounting
Bracket
(shipped with
Base Station)

#6

flatwasher

2 1/4"

Advertising