Technical product manual - dct1900 – Nortel Networks DCT1900 User Manual

Page 267

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CPU Cabling

Install-DCT1900/R8/mw

20-3

© 2000-2005

Fig. 20-2 Connections to SDB

Connections to the SDB
For the connections to the SDB also refer to Chapter 18:
1.

Ensure that the SDB is installed on the bottom plate of the cabinet and that the CPU strap set-
tings are in the proper position. The required material is part of the installation set, sync port kit
(NTMNB 101 107).

2.

Connect the CPU/SDB Twisted Pair Sync cables (TSRNB 101 48) as indicated in Figure 20–2
(see also Figure 20–1).

3.

Connect the external sync in cable to a sync out outlet of another DCT1900 when this CPU is
not the synchronization master.

4.

Connect the external sync out cables to the sync in inlets of the DCT1900 systems that are
synchronization slaves to this CPU.

5.

Fasten the external sync cables to the cable tie blocks on the ground strip (see Figure 20–3)
using tie wraps.

Sync in

Sync out 1

Sync out 2

Sync out 3

to backplane

SDB

TSRNB 101 48

X6

X5

X7

X8

X3

X4

External sync cables

X1

X2

CPU

Sync in (from master)

Sync out 1 (to slave)

Sync out 2 (to slave)

Sync out 3 (to slave)

Advertising