5 installation set sync port cpu – Nortel Networks DCT1900 User Manual

Page 80

Advertising
background image

Technical Product Manual - DCT1900

Product Specifications, Cabinets

5-2

Specs-DCT1900/R8/mw

© 2000-2005

5.4

Synchronization Distribution Board, SDB -REX-BRD0006 or ROANB 101 38

The SDB is mounted to the Modular Cabinet during system installation. It is part of the Sync Kit -
see Paragraph 5.5 only required in multiple system configurations.

Length x width

: 2.6" x 2.2" (66 x 56mm)

Connector for external cables

: shielded modular jacks RJ12 with six terminals

5.5

Installation Set Sync Port CPU

The installation set comprises material to install the sync ports which enable PWT air interface
synchronization between DCT1900 systems. The set comprises the following material:

SDB

: Synchronization Distribution Board to be mounted to the

modular cabinet which enables the connection of
synchronization cabling.

CPU/SDB cables

: Connects the CPU to the SDB.

CE Label

: CE marking label to be used if the cabinet is CE marked.

Advertising