3 installation – Nortel Networks DCT1900 User Manual

Page 197

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Cell Link Unit (CLU-S) –REX-BRD0016 or ROFNB 157 16/2

Install-DCT1900/R8/mw

8-3

© 2000-2005

Fig. 8–2 Power Distribution on the CLU-S

8.3

Installation

1. Insert the CLU-S into the card guides in the specified board position.
2.

Gently push the board into the back connector until it locks. Don’t use any force.

3.

Connect the CLU power cable, TSRNB 101 33.

4.

Connect the CLU signal cable, NTM/TSRNB 101 29.

+T

CLC 8

P0

P1

SC0

SC1

Base Station 8

CLC 1

SC0

SC1

EPP0, 1

Base Station 1

Power from

MCCB

EPP0, 1

+T

+T

+T

Thermistor

CLU-S

Advertising