Nortel Networks DCT1900 User Manual

Page 282

Advertising
background image

Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CLU/SLU to Base Station Cabling

21-6

Install-DCT1900/R8/mw

© 2000-2005

Fig. 21-5 Local Powering of a Base Station

Note: If a Base Station is going to be powered locally, then the CLU/SLU board that it is
connected to MUST NOT have the CLU/MCCB power cable (TSRNB 101 33) hooked up to it.
This means that all 8 Base Stations on that CLU/SLU board can only be powered locally!

(-)

(+)

G/W (+)

W/G (-)

O/W

W/O

B/W

AC/DC
ADAPTER

WHITE/BLUE – SC1-0

BLUE/WHITE – SC1-1

WHITE/ORANGE – SC0-0

ORANGE/WHITE – SC0-1

66 BLOCK IN IDF

W/B

3

6

4

5

2

1

RJ 45
PINS

FROM MDF

HOUSE PAIRS

Warning

IF Base Station cables go outside the building, the system must be protected from

lightning strikes by surge arresters.

Refer to Ascom Application Note AN_0252 for UL approval Lightning Protection

Devices and Installation Procedures.

Advertising