This section describes a series of checks and tests that have to be executed after completing the
installation and initialization of the DCT1900 system. The purpose of these tests is to verify that the
DCT1900 system is functioning properly after the installation is completed. If it appears that a part
is malfunctioning while the system is installed correctly (i.e.: no cabling faults, no configuration
faults), the technician must consult Section 7, "Maintenance" included in this manual for fault
finding.
Note:
Be sure that all batteries in the Portable Telephones are charged up before executing the tests.