Figure 12 backup schedules in element manager – Nortel Networks NN43001-106 User Manual

Page 522

Advertising
background image

522

Backup and restore

— TU

— WE

— TH

— FR

— SA

HOUR — specifies the hour in the day at which the backup occurs. The
range is 0 to 23, with a default of 3. This parameter does not apply
when FREQ is set to the value A.

Backup schedules are only supported on CP PII and CP PIV systems. A
backup schedule can be created, modified, deleted, and printed by the
respective command options

NEW

,

CHG

,

OUT

, and

PRT

.

Element Manager backup schedules page

The Element Manager backup schedules page allows the user to edit or
delete all currently configured schedules or add a new backup schedule.
Element Manager ensures all schedule information is kept current by
querying the call server for all configured backup schedules and backup
rules. The backup schedules page is illustrated in

Figure 12 "Backup

schedules in Element Manager" (page 522)

.

Figure 12
Backup schedules in Element Manager

Nortel Communication Server 1000

Features and Services - Book 1 of 6 (A to B)

NN43001-106

01.04

Standard

Release 5.0

27 July 2007

Copyright © 2007, Nortel Networks

.

Advertising