4 setting of tags and addresses, Setting of tags and addresses -3 – Yokogawa EJX930A User Manual

Page 30

Advertising
background image

<5. Configuration>

5-3

IM 01C25R03-01E

Table 5.3

Execution Schedule of the EJX

Function Blocks

Index

Parameters

Setting (Enclosed is

factory-setting)

269

(SM)

MACROCYCLE_

DURATION

Cycle (MACROCYCLE)

period of control or

measurement. Unit is 1/32

ms. (16000 = 0.5 s)

276

(SM)

FB_START_

ENTRY.1

AI1 block startup time.

Elapsed time from the start of

MACROCYCLE specified in

1/32 ms. (0 = 0 s)

277

(SM)

FB_START_

ENTRY.2

AI2 block startup time.

Elapsed time from the start of

MACROCYCLE specified in

1/32 ms. (8000 = 250 ms)

278

(SM)

FB_START_

ENTRY.3

AI3 block startup time.

Elapsed time from the start of

MACROCYCLE specified in

1/32 ms. (16000 = 500 ms)

279

(SM)

FB_START_

ENTRY.4

AI4 block startup time.

Elapsed time from the start of

MACROCYCLE specified in

1/32 ms. (24000 = 750 ms)

280

to

289

(SM)

FB_START_

ENTRY.5

to

FB_START_

ENTRY.14

Not used.

A maximum of 30 ms is taken for execution of

AI block. For scheduling of communications for

combination with the next function block, the

execution is so arranged as to start after a lapse

of longer than 30 ms. In no case should function

blocks of the EJX be executed at the same time

(execution time is overlapped).
Figure 5.3 shows an example of schedule based on

the loop shown in Figure 5.2.

F0502.ai

LIC100

FIC100

FC100

FI100

EJX

#2

LI100

EJX

#1

Figure 5.2

Example of Loop Connecting

Function Block of Two EJX with Other

Instruments

LI100

LIC100

FIC100

FC100

FI100

Commu-

nication

Schedule

OUT

IN

OUT

CAS_IN

BKCAL_OUT

BKCAL_IN

BKCAL_IN

BKCAL_OUT

IN

Unscheduled

Communication

Scheduled

Communication

F0503.ai

Macrocycle (Control Period)

Figure 5.3

Function Block Schedule and

Communication Schedule

When the control period (macrocycle) is set to more

than 4 seconds, set the following intervals to be

more than 1% of the control period.

- Interval between “end of block execution” and

“start of sending CD from LAS”

- Interval between “end of block execution” and

“start of the next block execution”

5.4 Setting of Tags and

Addresses

This section describes the steps in the procedure

to set PD Tags and node addresses in the EJX

multivariable transmitter. There are three states of

Fieldbus devices as shown in Figure 5.4, and if the

state is other than the lowest SM_OPERATIONAL

state, no function block is executed. EJX must be

transferred to this state when an EJX tag or address

is changed.

UNINITIALIZED

(No tag nor address is set)

Tag clear

Tag setting

INITIALIZED

(Only tag is set)

SM_OPERATIONAL

(Tag and address are retained, and

the function block can be executed.)

Address clear

F0504.ai

Address setting

Figure 5.4

Status Transition by Setting PD Tag and

Node Address

Advertising
This manual is related to the following products: