JLG X700AJ Operator Manual User Manual

Page 104

Advertising
background image

SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE

6-8

– JLG Lift –

3128790

Figure 6-3. Component Maintenance Intervals - X700AJ - with Perkins Diesel Engine

PERKINS DIESEL ENGINE

‐ Regarding in‐depth 

maintenance of the 
engine, see the supplied 
manufacturer ’s maintenance.

DETAIL

INTERVENTION

BEFORE

START‐UP

ACCORDING

TO NECESSITY

INTERVAL (HOURS)

10

50

100

250

500

1000

DRY AIR FILTER

CONTROL, CLEANING

REPLACEMENT

ENGINE OIL

CHECK LEVEL

REPLACEMENT

*

MOTOR OIL FILTER

CLEANING

REPLACEMENT

FUEL FILTER

CLEANING

REPLACEMENT

WATER SEPARATOR

CLEANING AND

DRAINING WATER

*

COOLING SYSTEM

CHECK LIQUID LEVEL

LIQUID ADD./

REPLACEMENT 

HYDRAULIC OIL

CHECK LEVEL

REPLACEMENT

HYDRAULIC OIL

FILTER

CARTRIDGE

REPLACEMENT

*

ARTICULATED

JOINTS

GREASING

*

BATTERY

CHECK ELECTROLYTE

LEVEL

GEARBOX OIL

CHECK LEVEL

REPLACEMENT

*

MACHINE

GENERAL PERIODIC

CONTROL

*

BOOM CABLES

AND SHEAVES

CHECK WEAR

**

*

REPLACEMENT

***

COUPLING ELEMENT

SCREWS TIGHTNESS

CONTROL

*

PLATFORM MOUNT
PIN NUTS

#

#

CHECK TORQUE

200 Nm

Check every year.
If the torque is not
correct replace the nuts
with two new nuts of
the same specification.
Install dry without
using oil or grease to
specified torque.

First time service interval

then per chart thereafter.

** Every 3 months or
     1000 hrs of operation.

*** Every 5 years or
       2000 hrs of operation.

Advertising