General

Begin the "Walk-Around Inspection" at Item 1, as noted
on the diagram. Continue checking each item in
sequence for the conditions listed in the following check-
list.

TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.

DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE
BEEN CORRECTED.

INSPECTION NOTE: On all components, make sure
there are no loose or missing parts, that they are securely
fastened, and no visible damage, leaks or excessive wear
exists in addition to any other criteria mentioned.

1. Platform Assembly, Footswitch, Ladder and Gate

- Footswitch in good working order, not modified,
disabled or blocked. Manuals in storage container,
access bar slides up and down properly, platform
properly installed and with both caps screwed on.
See Inspection Note.

2. Platform/Remote & Ground Control Stations -

Switches and levers return to neutral, decals/plac-
ards secure and legible, control markings legible.

3. Outriggers - See Inspection Note; pads pivot freely.

4. Electrical & Hydraulic Cover Assemblies - See

Inspection Note.

5. Boom Sections & Turntable - See Inspection Note.

6. Drive Tracks - Properly Adjusted. See Inspection

Note.

7. Gas/Diesel Engine & Main Hydraulic Pump - Free

of debris and See Inspection Note.

8. Swing Drive & Turntable Bearing- Check for

proper lubrication. See Inspection Note.

9. Hydraulic Tank - Hydraulic oil level correct and See

Inspection Note.

10. Electric Engine and Hydraulic Pump - See Inspec-

tion Note.

11. Platform Rotator & Machine Bubble Level - See

Inspection Note.