4 base and boom/jib alignment, 4 base and boom/jib alignment -4 – JLG X700AJ Operator Manual User Manual

Page 50

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-4

– JLG Lift –

3128790

1. Before connecting the machine to the electrical cir-

cuit, ensure the key on the gas/diesel engine is in
the OFF position.

2. Power the machine using a heavy duty AC power

cord with sufficient amperage capacity, through the
connector (item 2) positioned near the electric
engine.

3. Turn on the circuit breaker switch (item 3) positioned

behind the clear plastic cover near the electric
engine ( symbol is ON - O symbol is OFF).

4. Start the electric engine using the engine start but-

ton at the ground/emergency control box. (item 5 -
Figure 4-1.)
and operate machine.

5. When finished operating with the electric engine,

turn off switch (item 3), unhook the electric AC cord
from receptacle (item 2), and disconnect ground dis-
charger cable (item 1), if it was required.

4.4 BASE AND BOOM/JIB ALIGNMENT

The machine has two reflectors/photocells that check if the
boom assembly is completely lowered and retracted, the jib is
lowered, and the turntable is aligned with the base. (see pho-
tos)

When these conditions are met this symbol will
display in position (6) on the Platform/Remote
Control LCD display.

UNLESS THESE CONDITIONS ARE MET, DRIVE, STEER,
TRACK WIDTH ADJUSTMENT, AND OUTRIGGER MOVE-
MENT IS PREVENTED.

Base/Boom Alignment - Visual Indicator

Advertising