JLG X700AJ Operator Manual User Manual
Page 84
SECTION 5 - EMERGENCY PROCEDURES
5-4
– JLG Lift –
3128790
Using Emergency/Ground Controls from Ground
ENSURE BOOM IS NOT POSITIONED OVER THE OUTRIGGERS OR
OVERHEAD OF PERSONNEL BEFORE LOWERING.
1. Be certain the emergency stop button (item 1) is in the
ON position by turning it clockwise.
2. Start the engine, if not already running.
3. At the Emergency/Ground Control box, turn the key
switch (item 2) all the way clockwise and hold.
4. Check that the green (machine stabilized) indicator light
(item 4) on the Emergency/Ground Control box is on.
5. Operate the appropriate manual control lever (item 5, 6,
7, or 8) next to it’s proportional valve under the cover of
the valve distributor. See decal on valve distributor
cover for boom component and direction to operate
lever for desired movement.
6. When finished, release the key switch (item 2) back to
the neutral position.
7. Position (press) the emergency stop switch (item 1) to
the OFF position.