9 shut down and park, 9 shut down and park -24 – JLG X700AJ Operator Manual User Manual

Page 70

Advertising
background image

SECTION 4 - MACHINE OPERATION

4-24

– JLG Lift –

3128790

4.9 SHUT DOWN AND PARK

WHEN PARKING THE MACHINE ON A SLOPE OR UNEVEN GROUND
WITH THE OUTRIGGERS RETRACTED, PARK WITH THE TRACKS IN
THE FULLY WIDENED POSITION AND BLOCK THE TRACKS USING
WEDGES TO PREVENT MACHINE MOVEMENTS.

1. Drive machine to a reasonably well protected area.

2. Ensure the boom and jib are in the stowed (aligned)

position.

3. Remove all load and allow engine to operate 3-5

minutes at LOW setting to permit reduction of inter-
nal engine temperatures.

4. Shut down the gas/diesel/electric engine with the

same button on the platform/remote control station
used to start it. Complete machine shut down will
take approximately 1 minute, LCD display OFF.

5. At ground and platform controls, push in the emer-

gency stop buttons. remove the key at the ground
controls, and turn off the key at the engine.

6. Close the platform control console lid. If necessary

to protect instruction placards, warning decals and
operating controls from hostile environment, place a
cover over this area.

7. If machine is to be shut down for long periods of

time, turn the battery disconnect switch, RED handle
located on the electrical/battery tray housing, to the
POWER OFF position. (see photos below)

POWER ON
Clockwise

POWER OFF
Counter-
Clockwise

Advertising