2 base frame covers, Front cover - installation (original), Front cover - installation (carry deck version) – JLG SSV10 Service Manual User Manual

Page 30: Carry deck support frame - installation, Rear bumper cover - installation, 2 base frame covers -2

Advertising
background image

SECTION 3 - BASE COMPONENTS

3-2

– JLG Lift –

3121187

3.2 BASE FRAME COVERS

Front Cover - Installation (Original)

Front Cover - Installation (Carry Deck Version)

Carry Deck Support Frame - Installation

Rear Bumper Cover - Installation

Five (5) of the Drive Motor cover screws must be removed
to remove the rear bumper cover, see the Drive Motor
Cover - Installation illustration. To gain access to those
screws, elevate the platform.

NEVER WORK UNDER AN ELEVATED PLATFORM UNTIL THE
PLATFORM HAS BEEN SAFELY RESTRAINED FROM ANY MOVE-
MENT BY BLOCKING OR OVERHEAD SLING.

Front Cover Installation

1. Front Cover

2. Cover Screws (3-places)

Front Cover (Carry Deck) Installation

1. Front Cover(Carry Deck) (a)

2. Cover Latches (3-places) (b)

NOTE: (a) The Carry Deck has a maximum capacity of 250 lb.

(115k).
(b) Lift each latch until straight out to release from the
latch mount under the cover. Lift the rear of the hood
slightly out of the frame gasket and pull out on each rear
latch to clear the latch mount on the base frame. Lift deck
and slide deck forward and lift to remove deck from
machine.

Carry Deck Support Frame Installation

1. Carry Deck Support

2. Support Screws (4-places)

(Apply Loctite #242)

Rear Bumper Cover Installation

1. Bumper Cover
2. Screws/Washers

3. AC Input - Receptacle

Assembly Cover

Advertising