JLG SSV10 Service Manual User Manual

Page 89

Advertising
background image

SECTION 5 - MAST COMPONENTS

3121187

– JLG Lift –

5-17

43. Shim per instructions in step 7, Mast Section 2 -

Assembly. Apply Loctite #242 to attach screw
threads on final assembly.

44. Attach the sequencing cables and hardware to the

side of the mast assembly.

45. Install the platform junction box to ground control

station wiring harness (See Figure 5-7.), including
the platform junction box, powertrack assembly, har-
ness cable sheave assembly, and harness spring
tensioner to the side of the mast assembly. Also ref-
erence Section 4, Platform Junction Box Install/
Remove.

46. The mast assembly is now complete and ready to

install onto the base frame.

Top of Mast Section-4 - Slide Pad Installation

1. Slide Pads
2. Shim Stock

3. Slide Pad Attach Screws (a)

Note: (a) Apply Loctite #242 to attach screws on final assembly.

Side of Mast Section-2 - Lower Sequence Cable Bracket

1. Mast Section-2
2. Lower Bracket Attach

Screws

3. Lower Bracket
4. Sheave Wheel Attach Bolt

5. Sheave Wheel Thrust

Washer

6. Sequence Cable Sheave

Wheel

7. Spacers (Qty. 4)

Side of Mast Section-3 - Lower Sequence Cable Bracket

1. Mast Section-3
2. Lower Bracket Attach

Screws

3. Lower Bracket
4. Sheave Wheel Attach Bolt

5. Sheave Wheel Thrust

Washer

6. Sequence Cable Sheave

Wheel

7. Spacers (Qty. 4)

Side of Mast Section-4 - Lower Sequence Cable Bracket

1. Mast Section-4
2. Bracket Attach Screws

3. Lower Bracket

Advertising