JLG SSV10 Service Manual User Manual
Page 58
SECTION 4 - CONTROL COMPONENTS
4-4
– JLG Lift –
3121187
All the platform mounted switches and controls connect to
the platform junction box before running to the Ground
Control Module (P2, P3, and P4 Connectors), the Ground
Control Module Harness is attached to the side of the
mast assembly.
Junction Box to Ground Control Harness -
Remove/Install
Platform Junction Box - Installation
1. Platform Junction Box
2. Junction Box Attach
Screws
3. Platform Console Harness
Connector
4. Ground Control Module
Harness Connector
5. Platform Aux. # 2 Connec-
tor (Spare)
6. Platform Aux. #1 (Foot-
switch/Platform Gate Inter-
lock Connector)
7. Programmable Security
Lock (PSL) Connector
7
3
2
4
5
6
1
Junction Box to Ground Control Module Harness - Installation
1. Platform Junction Box to
Ground Control Harness
2. Spring Tensioner Clamp
3. Harness Power Trak
Assembly
Note: See Figure 5-7., Section 5 - Mast Components for more
detailed installation.
1
3
2