SECTION 3 - BASE COMPONENTS

3-18

– JLG Lift –

3121187

3.7 BATTERIES AND BATTERY CHARGER -

SERVICE PROCEDURES

Battery Condition Testing

NOTE: Batteries in storage should be kept at 12.5V or higher.

Before testing for battery condition, the open circuit volt-
age should be taken from each battery. If the voltage of
the batteries differs by 0.3 volts or more, the lower voltage
battery should be replaced.

Battery Testing Can Be Performed In Two Ways:

1. The batteries can be tested using a battery tester

capable of testing 12V 100Ah AGM VRLA (Valve
Regulated Lead Acid)
batteries, using the instruc-
tions of the battery tester manufacturer.

2. If an appropriate battery tester is unavailable, the

batteries can be tested by fully charging them with
the charger that is installed in the machine. Then
check the battery voltage of each battery - 4 hours -
after charging is complete. Batteries less than 12.72
volts should be replaced.

NOTE: If a faulty charger is suspected, the batteries can be charged

using a charger that supplies 2.45 volts/cell. Charging
should be terminated when the charge current drops below 1
amp.

Battery Replacement

Replacement battery(s) must be of equivalent voltage and
amperage output as the OEM battery(s) in order for the
machine to operate to as manufactured specifications.
Battery replacement part weight must also be equivalent
to OEM, (65 lb.) (30Kg) per battery, in order to maintain
machine stability as manufactured.

DO NOT REPLACE ITEMS CRITICAL TO STABILITY, SUCH AS
BATTERIES, WITH ITEMS OF DIFFERENT WEIGHT OR SPECIFI-
CATION. DO NOT MODIFY UNIT IN ANY WAY TO AFFECT STABIL-
ITY.

Battery - Installation

To gain access to the batteries, requires removal of the
front cover and rear drive motor cover See Section 3.2 on
page 3-2.

Procedure for removal is same for both batteries.

On installation, batteries set in machine with the posts to
the outside. Left side battery (+) POS post at front (shown
below), Right side battery (–) NEG post towards machine
front.

NEVER WORK UNDER AN ELEVATED PLATFORM UNTIL THE
PLATFORM HAS BEEN SAFELY RESTRAINED FROM ANY MOVE-
MENT BY BLOCKING OR OVERHEAD SLING.

Battery Installation (Left Side Battery Shown)

1. Battery (a) (b)
2. Hold-Down Bracket and

Screw

3. Battery Posts
4. Drive Motor Cover Screw

Brackets

NOTE: (a) Once hold-down bracket (item 2) is removed,

remove the cables from the battery posts, slide battery
forward to clear brackets (item 4). Then lift battery out
of base frame.
(b) The carry deck support frame will need to be
removed, on machines equipped with the carry deck.