SECTION 5 - MAST COMPONENTS

5-14

– JLG Lift –

3121187

MAST SECTION 3 - ASSEMBLY

21. Lay the wide chain set attached to the top of mast

section-1 into the open rail on mast section-2.

NOTE: Before sliding mast sections together, spray the slide

pad channels with Krytox lubricant spray, (JLG P/N-
3020041). Be careful not to scratch or score the
anodized finish in the slide pad channels.

22. Carefully slide mast section-3 into section-2 until

ends are even.

23. At the bottom of mast section-3, install the slide

pads between mast section-2. and 3. Shim per
instructions in step 7, Mast Section 2 - Assembly.

24. Push mast section-3 out the top of mast section-2

approximately 1 ft. (31cm).

25. Locate the lower chain anchor bracket (one with the

threaded attach holes horizontally aligned to outside
of bracket)
.

26. Working at the bottom end of mast section-3, insert

the threads (stud) ends of the (wide) chain set, now
laying between mast section-2 and 3, into the holes
of the lower chain anchor bracket. Loosely thread
two (2) 3/8"-16UNC nuts onto the stud threads on
each chain.

27. Slide the anchor plate into the closed rail at the bot-

tom of mast section-3 and attach the anchor plate to
the bottom of mast section-3 with four (4) 1/4"-
20UNC x 3/4" long bolts. Apply Loctite #242 to
threads on final assembly.

Top of Mast Section-2 - Slide Pad Installation

1. Wide Chain Set Attached

to Mast Section-1.

2. Mast Section-2

Bottom of Mast Section-3 - Slide Pad Installation

1. Slide Pads
2. Shim Stock

3. Shim Pad Screws

Bottom of Mast Section-3 - Chain Anchor Plate Installation

1. Lower Chain Anchor

Bracket

2. Anchor Bracket Screws

3. Wide Chain Set Studs
4. Chain Adjust and Jam

Nuts

Note: