Tweco 400 Ultra-Cut(May 2014) User Manual

Page 57

Advertising
background image

ULTRA-CUT 100 XT/200 XT/300 XT/400 XT

Manual 0-5302

INSTALLATION

3-33

Insert Fiber Optic cable here

Art # A-09153_AB

4. Secure each of the thin nuts on the through hole protectors so both nut faces are tight against the sheet metal inside and

out.

5. Plug the Fiber Optic Cable into the PCB as shown below for the DMC-3000. Make sure the locking tabs are engaged.

Plug Fiber Optic cable to/from DPC-3000 here

Art # A-09154

6.

Plug the Fiber Optic Cable into the PCB as shown below for the DPC-3000. Make sure the locking tabs are engaged.

Advertising
This manual is related to the following products: