Tweco 400 Ultra-Cut(May 2014) User Manual

Page 72

Advertising
background image

ULTRA-CUT 100 XT/200 XT/300 XT/400 XT

3-48

INSTALLATION Manual 0-5302

Art # A-11536

Fill Range

Coolant Tank

2. After the complete system has been installed, check that the coolant has been pumped through the system as follows

(see NOTE):

NOTE

Depending on the length of the torch leads, the system may require more coolant after turning the system ON for

the first time.

a. Place the ON/OFF Switch to ON.

b. After about 4 minutes the system may shut down if the leads are not full of coolant.

c. Place the ON/OFF switch to OFF. Add more coolant if needed

d. After 10 seconds place the ON/OFF switch to ON again.

e. Repeat steps ‘b’ through ‘d’ until the system no longer shuts down. Depending on the length of the torch leads this

sequence may need to be repeated.

f. After the system stays operational allow the pump to operate for ten minutes to properly purge any air from the cool-

ant lines before using the system.

3. Refill the reservoir and reinstall the filler cap.

4. Purge coolant from the torch before firing the torch. Ensure there are no leaks before use. If leaks are evident, consult

the coolant leak troubleshooting guide in the maintenance section of this manual.

Advertising
This manual is related to the following products: