Nh3: pass planning, Nh3: start of pass planning, Pass planning – Great Plains NP3000A Operator Manual User Manual

Page 64

Advertising
background image

60

NP3000 and NP3000A

Table of Contents

Index

Great Plains Manufacturing, Inc.

407-613M

Table of Contents

Index

2014-04-22

NH

3

: Pass Planning

If field requirements permit, you can minimize exposure
to NH

3

vapor with the following recommendations:

Refer to Figure 34
• Check the wind direction.

• Plan passes to be cross-wind and turns up-wind.

• Plan first pass on down-wind side of field.

• Choose your first pass to allow you to be up-wind

while operating valves at the nurse tank and
applicator. Opening the emergency shut-off valve
typically requires climbing on the applicator from the
right. Starting with the wind from the right is optimal.

Anhydrous Ammonia Exposure Hazard:
If field requirements result in any down-wind operations:
Use only a tractor with an enclosed cab.
Have an escape route (up-wind turn) available for all

down-wind operations.

Conduct end-of-pass operations to minimize above-ground

releases.

Be mindful of the risks of olfactory fatigue. You can

“get used to” the odor and fail to notice when
concentrations get dangerously high.

NH

3

: Start of Pass Planning

Ideally, you want NH

3

to begin flowing out of the tines

right at the start of a pass, with the tines already in the
ground. This minimizes atmospheric releases.

Depending on wind direction, tractor capability, available
headlands, and field conditions, there are several ways
to start each pass.

A. Capable Tractor:

Lower applicator into ground at start of pass. Pull
forward to set them to operating depth. Start meter
flow. Do not start moving until flow divider pressure
gauge nears typical operating value.

B. Headlands Available, Any Tractor:

Lower applicator to ground some distance ahead of
the application area. Move forward slowly. As tines
enter ground, start meter flow.

C. No Headlands, Marginal Tractor:

Lower applicator to ground at start of pass. Start
forward movement, then meter flow. Move slowly
until console rate display nears target rate.

Figure 34

Ideal Pass Planning

-

WIND

A18

Note: The procedures at left are not operating

instructions or checklists. They are outlines for
planning pass starts. See the step details starting
on page 73 and the checklists on page 76.

Advertising
This manual is related to the following products: