Field set-up checklists – Great Plains NP3000A Operator Manual User Manual

Page 78

Advertising
background image

74

NP3000 and NP3000A

Table of Contents

Index

Great Plains Manufacturing, Inc.

407-613M

Table of Contents

Index

2014-04-22

Field Set-Up Checklists

Use the following tables to develop a final checklist for
your tractor/fertilizer applicator configuration. Additional
or fewer steps may be necessary depending on tractor
features, fertilizer applicator options and planting
accessories.

Mechanical Checklist (Tractor Hitching)

Page

Fertilizer Applicator hitched

36

Stands stowed

42

Electrical Checklist

Page

Verify electrical hookups solid

40

Turn optional console POWER switch to
ON. Check console and observe any
diagnostic messages

a

a. Refer to console manual.

Hydraulic System Checklist

Page

Check tractor hydraulic reservoir full

-

Make hydraulic connections

41

Inspect connections for leaks

-

Perform a raise operation
(leave transport locks in)

48

Unfold Implement

51

Row Units Checklist

Page

Check row cleaner setup (Option)

87

Check tubing connections to tines

-

NH

3

: Check tine outlet behind shoes

NH

3

: Check shoe condition

NH

3

: Check tine shoes all at same height

NH

3

: Check tine shank alignment

Liq: Check outlet behind arms

-

Check coulter blade condition

-

Check coulter depth

82

Check NH

3

sealer adjustments

80

Check spider condition

Mechanical Checklist (post-Hitching)

Page

Raise implement.

48

Disengage transport locks

50

Check front-to-rear level

43

Check side-to-side level

84, 124

Set application height

82

NH

3

System Checklist (Cart Unhitched)

Page

Shut-off rope routed to tractor cab

39

Emergency shut-off valve closed

55

On/off solenoid valve closed

55

Control valve closed

55

Console POWER switch off

55

All bleed valves closed (3 or more)

56

Breakaway coupler mated (visual check)

56

All hydrostatic relief valve caps seated

56

Plumbing System Checklist

(Prior to Tank Connection)

Page

Liq: Orifice plate size matches rate

91

Fittings all secure

-

Liq: Relief valve adjusted

94

Liq: Pump rate set

94

Liq: Strainer recently cleaned

119

Liq: Inlet shut-off valve closed

30

Mechanical Checklist (Cart Hitching)

Page

Nurse tank hitched

70

Hitch pin locked

Safety chains secured

70

Advertising
This manual is related to the following products: