Field operation checklists – Great Plains NP3000A Operator Manual User Manual

Page 80

Advertising
background image

76

NP3000 and NP3000A

Table of Contents

Index

Great Plains Manufacturing, Inc.

407-613M

Table of Contents

Index

2014-04-22

Field Operation Checklists

Perform all steps in “Pre-Start Checklist” on page 47
and “Field Set-Up Checklists” on page 74. The
applicator is presumed to be unfolded and raised.

Note: These are merged anhydrous (NH

3

) and

conventional liquid (Liq) lists. NH

3

/Liq: refer to

material-specific operations. Some steps may
refer to Optional equipment.

First Pass Operation Checklist

Page

1

Raise fertilizer applicator.

48

2

Unfold, if not already unfolded.

51

3

Line-up at pass start per plan.

-

4

Pull forward and stop.

-

5

Check console
POWER switch ON,
BOOMS

a

switch(es) ON and

MASTER switch OFF

73

6

NH

3

: Re-check all line valves and bleed

valves closed.

61

7

NH

3

: Open tank withdrawal valve.

Check for zero releases.

61

8

NH

3

: Open applicator emergency shut-off

valve. Check for zero releases.

61

9

NH

3

: Open nurse tank hose inlet valve

(if any). Check for zero releases.

62

10 NH

3

: Open nurse tank hose outlet valve

(if any). Check for zero releases.

62

11 Liq: Open tank supply hose outlet valve.

33

12 Liq: Open applicator supply inlet shut-off

valve.

30

13 NH

3

: Check meter pressure gauge

matches tank pressure gauge.

62

14 NH

3

: Enter tractor cab.

Check ropes present with nominal slack.

73

15 Console (Option):

POWER on
MASTER on
RATE as desired

73

16 Lower applicator:

a. hitch (lower, then Depth Control)
b. wings (extend, then low rate continuous

extend)

48

17 Begin first pass, setting switch

MASTER to ON.

73

18 Liq: Hydraulic remote for hydraulic pump

to preset

71

19 Monitor the console (Option) for expected

reports of application rate/speed, and any
alarms.

-

20 Periodically check the applicator gauges

for expected pressures and temperatures.

-

21 Pay attention to odors. Watch for leaks.

-

a. BOOM 1, or BOOM 1,2,&3 (section control)

Pass Turn

a

Operation Checklist

a. Monitor flow divider pressure during end-of-pass

operations and turns. Adjust operations as needed
if true zero pressure is desired.

Page

1

Set console MASTER switch OFF some
distance before end of pass, or stop at
end of pass.

63

2

NH

3

: To minimize vapor release, wait for

flow divider pressure gauge to read zero
during final pass distance or while waiting
at end of pass.

48

3

While slowing at end of pass, or stopped

-

4

b

b. These steps are for a full stop prior to a turn. If the

lift is conducted while in motion, the exact order of
hitch and lift-assist raising is not critical. The
objective is to avoid any reverse motion of tines.

Fold and lift (to partially fold wings)

51

5

b

Raise 3-point hitch

-

6

Turn up-wind if possible.
Turn slowly to avoid tank cart upset.
Do not turn too tightly.

63

7

Make turn. Line up for next pass.

8

Lower applicator (same as step 16) for
First Pass, at left.

9

Begin pass, setting switch

MASTER to ON.

73

10 Begin next pass

First Pass Operation Checklist