Labconco Protector ClassMate Laboratory Hoods 69716 User Manual

Page 59

Advertising
background image

55

Product Service 1-800-522-7658

Chapter 7: Modifying Your Protector ClassMate Fume Hood

typical size required for a single switch
electrical box. If the cardboard template is not
available, a dimensioned pictorial is at the back
of the manual included with the monitor.

Step 2: Using the template, mark off the 3" high by 2"

wide hole necessary to clear the rear enclosure
portion of the monitor. Mark off the two
mounting screw hole locations.

Step 3: Drill a pilot hole in each of the four corners.

Use the saw to cut out the hole. A suitable
nibbling tool may also be used.

Step 4: Drill the two #37 mounting screw holes.
Step 5: Screw the monitor to the fume hood front panel.
Step 6: Remove the 0.50" diameter hole plug located on

the front of the upper top shelf to the right of the
fluorescent lights. Install the .50" diameter x
9.00" long tube P/N 6985100 in the hole. The
.50" diameter tube shall extend into the interior
fume hood cavity 7.50" with 1.50" above the top
shelf. Secure the tube with silicone sealant P/N
1579100.

Step 7: Turn the blower and light switches to OFF.

Connect the input/output signal wiring, if
required, to the terminal block on the back of
the monitor. See the Electrical Wiring Appendix
C
section for wiring information.














Figure 7-5

Air Hose

Manifold

Cover Plate with
115V Outlet,
under ETL
cover.

Advertising