Basic Setup Procedure

Table 2-1 provides a summary of the basic setup procedure with references to the relevant
sections in this chapter. Refer to this table if you are unfamiliar with the installation
requirements for the power supply. Complete each step in the sequence given.

Table 2-1

Basic Setup Procedure

Step

Description

Action

Reference

1

Inspect

Inspect the power supply.

“Step 1: Inspecting and Cleaning”
on page 2-3.

2

Install

Install the power supply
(benchtop or rack mount).
Ensure adequate ventilation.

“Step 2: Location and Mounting” on
page 2-4.

3

Connect Input
Power

Connect AC input power.

“Step 3: Connecting AC Input

Power” on page 2-5.

4

Select Wires

Select wires that are correctly
rated for the maximum DC
output current.

“Step 4: Selecting Load Wires” on
page 2-8.

5

Te s t

Perform functional tests for
voltage mode operation, current
mode operation, and front panel
controls.

“Step 5: Performing Functional
Tests” on page 2-10.

6

Connect Loads

Connect the load wires to the
DC output.

“Step 6: Connecting Loads” on
page 2-12.

7

Connect Remote
Sensing (if
required)

Connect remote sensing
connectors on power supply to
load.

“Step 7: Connecting Remote
Sensing” on page 2-15.