Maintenance – Beisler 1282-4 User Manual

Page 39

Advertising
background image

Closing Seam Machine 1282-4 Working Instructions

- 10 -

Beisler Automated Sewing Equipment

C.5

Maintenance

C.5.3 Service

The following service works must be carried out in weekly
intervals.

Oiling the rails:
1. Disconnect machine from power supply.
2. Wipe guide clamp guide rail using a clean, oil-saturated

cloth.

3. Wipe contour guide X and Y rail using a clean, oil-sa-

turated cloth.

NOTE - Oil supply!

The scope of delivery comprises 0.25 l of oil. When this
oil is used up, you can order the special machine oil for
service from the manufacturer or supplier of the
machine.

Emptying the water separator:
1. Disconnect machine from power supply.
2. Fig. 5: Drain water at pressure reducer water separator

into suited container.
Press button

1

at pressure reducer collector and keep

pressed until all the water has been drained.

Sewing head service:

NOTE - Sewing head service instructions!

For information about service of the sewing head, plea-
se refer to the working instructions of the sewing head.

Fig. 5

Fig. 5

Advertising