Chapter 2. installation, 1 unpacking and inspection – Comtech EF Data MBT-5003 User Manual

Page 27

Advertising
background image

2–1

Chapter 2. INSTALLATION

2.1

Unpacking and Inspection

The MBT-5003 L-Band Up/Down Converter System and its Installation and Operation Manual
are packaged and shipped in a pre-formed, reusable cardboard carton containing foam spacing for
maximum shipping protection.

Inspect shipping containers for damage. If shipping containers are damaged, keep them until the
contents of the shipment have been carefully inspected and checked for normal operation.

CAUTION


Do not use any cutting tool that will extend more than 1” into the container
and cause damage to the converter.

Unpack and inspect the MBT-5003 as follows:

Step

Procedure

1

Cut the tape at the top of the carton indicated by

OPEN THIS END.

2

Remove the cardboard/foam space covering the MBT-5003.

3

Remove the MBT-5003, manual, and power cord from the carton.

4

Save the packing material for storage or reshipment purposes.

5

Inspect the equipment for any possible damage incurred during shipment.

6

Check the equipment against the packing list to ensure the shipment is correct.

7

Refer to the next section (Section 2.2) for installation instructions.

Advertising