Work flow, Work flow -2 – Verilink AS4000 (34-00244) Product Manual User Manual

Page 22

Advertising
background image

Quick Set-Up Guide

2-2

Verilink AS4000 User Manual

Figure 2-1 Example Network

Work Flow

The four major tasks of the installation are:

• Physical Installation

• System Configuration

• Port Configuration

• Connection Mapping

A basic work flow diagram is provided in

Figure 2-2

.

Advertising