Hardware Installation

3-2

Verilink AS4000 User Manual

Unpack the AS4000 components and inspect for possible damage:

• Shelf units

• Power supplies

• All application modules

Repack the application modules and rear connector modules in
their respective anti-static envelopes until everything else is
assembled and you are ready to install them.

Wiring for DC Power

Wiring for the office battery power and ground connections to the
DC power module are not provided by Verilink. Use one of the
following wire gauges for the 48 VDC and battery return runs:

• 18-gauge solid wire. Both wires total 40 feet (12.2 meters) or

less.

• 14-gauge solid wire. Both wires total 40 to 65 feet (12.2 to 20

meters).

Shelf Mounting

The AS4000 has mounting brackets molded to the shelf front face
for rack installation. The mounting brackets have been designed to
mount the shelves in a 19 inch equipment rack. The AS4000 is a
front-mounted shelf unit (