HEIDENHAIN ND 1100 User Manual

Page 69

Advertising
background image

Quadra-Chek

®

QC200

4-27

Entering machine zero offsets:
Select the X and Y Machine 0

X and Y Machine 0

X and Y Machine 0

X and Y Machine 0

X and Y Machine 0

data fields

data fields

data fields

data fields

data fields and enter the X and
Y offsets from the machine ref-
erence to the datum of the stan-
dard grid. In this example the
Machine 0 values were 0.50 and
0.48 inches.

Entering the data type:
Scroll to the Nominal Error/Ac-

Nominal Error/Ac-

Nominal Error/Ac-

Nominal Error/Ac-

Nominal Error/Ac-

tual data field

tual data field

tual data field

tual data field

tual data field and select the
data type for cell dimension
measurements. The type can be
the actual measurement (Ac-

actual measurement (Ac-

actual measurement (Ac-

actual measurement (Ac-

actual measurement (Ac-

tual)

tual)

tual)

tual)

tual), or the difference be-

difference be-

difference be-

difference be-

difference be-

tween the nominal and actual

tween the nominal and actual

tween the nominal and actual

tween the nominal and actual

tween the nominal and actual
measurement (Error)

measurement (Error)

measurement (Error)

measurement (Error)

measurement (Error). In this
example Actual is selected.

Inputting measurement data:
Scroll to the X and Y position

X and Y position

X and Y position

X and Y position

X and Y position

data fields (P

data fields (P

data fields (P

data fields (P

data fields (Pos)

os)

os)

os)

os) and if neces-

sary increment or decrement the
contents using the Inc or Dec

Inc or Dec

Inc or Dec

Inc or Dec

Inc or Dec

softkeys

softkeys

softkeys

softkeys

softkeys to select the grid po-

grid po-

grid po-

grid po-

grid po-

sition 1,1

sition 1,1

sition 1,1

sition 1,1

sition 1,1. This corresponds to
the datum (0,0) for the standard
grid.

NOTE

NOTE

NOTE

NOTE

NOTE
Grid position 1,1 is the datum for grid measurements, therefore

Grid position 1,1 is the datum for grid measurements, therefore

Grid position 1,1 is the datum for grid measurements, therefore

Grid position 1,1 is the datum for grid measurements, therefore

Grid position 1,1 is the datum for grid measurements, therefore
the Actual or Error values for X and Y must always be zero.

the Actual or Error values for X and Y must always be zero.

the Actual or Error values for X and Y must always be zero.

the Actual or Error values for X and Y must always be zero.

the Actual or Error values for X and Y must always be zero.

Advertising