Unpack and inspect, Installation and wiring, Verify drive operation – Yaskawa CM012 DeviceNet Option Card User Manual

Page 8: Unpack and inspect -3, Installation and wiring -3

Advertising
background image

Installation 1-3

Unpack and Inspect

Prior to unpacking, check the package label and verify that the product received matches the product ordered. Unpack the option and verify
that the following items are included in the product package and are undamaged.

Fig 1.1 – DeviceNet Option Card

Installation and Wiring

‹

Verify Drive Operation

Connect power to the drive and verify that the drive functions properly. This includes running the drive from the operator keypad. Refer to
the appropriate drive technical manual for information on connecting and operating the drive.

Remove power from the drive and wait for the charge lamp to be completely extinguished. Wait at least five additional minutes for the drive
to be completely discharged. Measure the DC bus voltage and verify that it is at a safe level.

Table 1.1 – DeviceNet Option Card

Item

Qty

DeviceNet Option Card (UTC000180)

1

Installation Guide (IG.AFD.16)

1

Dangerous voltages in excess of 400VDC (230V drives) or 800VDC
(460V drives) are present at the DC bus terminals of the drive.

WARNING!

Advertising