Demonstration, Operation manual, Running the program – ACU-RITE MILLPWR 3 Axes User Manual

Page 95

Advertising
background image

DEMONSTRATION

MILLPWR

®

Operation Manual

4-19

Running the Program

The first step in running a new program is to establish datum.
Remember to chose the center of the bolt circle as datum.

Using the

MOVE TABLE

softkey and the arrows, position the

tool over the workpiece where you want the center of the bolt
circle’s datum to be.

Place your workpiece into a vise.

From the DRO screen, press the

DATUM

softkey.

Press the

X = 0

,

Y = 0

and

Z =0

softkeys to establish

the current tool position as datum.

Press the

ARROW DOWN

softkey.

Return to your program by pressing the

PGM

key. Perform a

second dry run, this time allowing the table to move, to see if there is
enough material to run the program. Set zero.

Touch the tool to the top surface of your workpiece.

Set the Z retract position 1” above the workpiece.

Press the

USE

key.

If your cursor
is positioned
past the last
step,
MILLPWR
will automati-
cally go to step
001 when you
press GO.

Now press the

GO

key and check that the Z-axis

is engaged.

Press the

GO

key again.

MILLPWR

will run each

step at dry run speed without stopping.

If the part falls entirely within the workpiece, you can
cut the part.

Place the tool you want to use first into the spindle.

After you’ve finished moving the table, press the

MOVE

TABLE

softkey again to de-select it.

Advertising