GE Industrial Solutions AF-600 FP High Power (460V_575V 150HP and above) User Manual
Page 117
Advertising
11.
Remove the SCR gate lead connectors from the modules.
12.
Remove the SCR/diode module retaining screws on each module (T30) and remove the SCR/diode modules.
130BX163.10
1
2
3
Illustration 7.1: 42/44 SCR/Diode Module (4 of 4)
1
SCR/diode module (Step 12)
2
SCR gate lead connectors (Step 11)
3
SCR/diode module mounting screws (Step 12)
REASSEMBLY
1.
To replace SCR/diode modules, follow the instructions included with the replacement module.
2.
Reassemble in reverse order. Tighten the remaining T25 and 8 mm screws to 2.3 Nm (20 in-lbs) and T30 to 4 Nm (35 in-lbs).
3.
Be sure to cross the tighten replacement unit with the spare part per instructions.
AF-650 GP and AF-600 FP High Power Service Manual
116
7
Advertising