GE Industrial Solutions AF-600 FP High Power (460V_575V 150HP and above) User Manual

Page 117

Advertising
background image

11.

Remove the SCR gate lead connectors from the modules.

12.

Remove the SCR/diode module retaining screws on each module (T30) and remove the SCR/diode modules.

130BX163.10

1

2

3

Illustration 7.1: 42/44 SCR/Diode Module (4 of 4)

1

SCR/diode module (Step 12)

2

SCR gate lead connectors (Step 11)

3

SCR/diode module mounting screws (Step 12)

REASSEMBLY

1.

To replace SCR/diode modules, follow the instructions included with the replacement module.

2.

Reassemble in reverse order. Tighten the remaining T25 and 8 mm screws to 2.3 Nm (20 in-lbs) and T30 to 4 Nm (35 in-lbs).

3.

Be sure to cross the tighten replacement unit with the spare part per instructions.

AF-650 GP and AF-600 FP High Power Service Manual

116

7

Advertising