GE Industrial Solutions AF-600 FP High Power (460V_575V 150HP and above) User Manual

Page 145

Advertising
background image

8.2.13 IGBT Modules

1.

Remove both DC capacitor banks in accordance with the procedure.

2.

Remove the Input Terminal Plate in accordance with procedure.

3.

Remove the wire retaining nut (10 mm) from each of the 3 SCR input bus bars.

4.

Note colour coding for each of the 3 wires attached to the retaining studs. Ensure that the correct wire is attached to the applicable stud upon reassembly.
Remove the wiring from the studs.

5.

Remove the wire retaining nut (8 mm) from the SCR output bus bars. One from the (+) DC bus bar and one from the (–) DC bus bar.

6.

Note colour coding for each wire attached to the retaining studs. Ensure that the correct wire is attached to the applicable stud upon reassembly.
Remove the wiring from the studs.

7.

Remove the 4 retaining nuts (13 mm) on the side of the bus bars, 2 on each bus bar.

CONTINUED NEXT PAGE

130BX130.10

1

2

3

4

Illustration 8.1: IGBT Modules (1 of 4)

1

Retaining nuts (Step 7)

3

IGBT board

2

Wire retaining nut on bus bar BB41 (Step 3)

4

Wire retaining nuts for output bus bars BB42
(Steps 5 & 6)

AF-650 GP and AF-600 FP High Power Service Manual

144

8

Advertising