3 dynamic test procedures – GE Industrial Solutions AF-600 FP High Power (460V_575V 150HP and above) User Manual

Page 86

Advertising
background image

6.3 Dynamic Test Procedures

Refer to the terminal locations in Illustration 6-10 for performing dynamic test procedures.

NB!
Test procedures in this section are numbered for reference only. Tests do not need to be performed in this order. Perform tests only as necessary.

Never disconnect the input cabling to the frequency converter with power applied due to danger of severe injury or death.

Take all the necessary safety precautions for system start up prior to applying power to the frequency converter.

130BX79.10

1

2

3

4

Illustration 6.12: Drive Power Terminals (4x-size Frames)

1

Main 3-phase AC power to frequency converter

3

Brake resistor connection

2

DC bus/load sharing connections

4

3-phase output to motor

AF-650 GP and AF-600 FP High Power Service Manual

85

6

Advertising