GE Industrial Solutions AF-600 FP High Power (460V_575V 150HP and above) User Manual

Page 118

Advertising
background image

7.2.12 SCR/Diode Module 41/43 Units

1.

Remove the capacitor bank per instructions.

2.

Remove the input terminal mounting plate per instructions.

3.

Remove the retaining screw (T25) from terminal 1 of each SCR/diode module.

4.

Remove the 8 mm retaining nut from the bus bar holding bracket and remove the bus bar, one for each input phase.

CONTINUED ON NEXT PAGES

130BX165.10

1

2

3

4

5

Illustration 7.1: 41/43 SCR/Diode Module (1 of 3)

1

Bus bar BB2 (Step 4)

2

Retaining screw access (Step 3)

3

Retaining nut (Step 4)

4

Bus bar BB1

5

SCR/diode module

AF-650 GP and AF-600 FP High Power Service Manual

117

7

Advertising