Getting started manual – Teledyne LeCroy LabMaster 9Zi-A User Manual

Page 55

Advertising
background image

Getting Started Manual

922157-00 Rev A

47

Gently pull the green tab on the cable plug to remove it.

Repeat the previous steps for every additional Slave Acquisition Module in
your system.

PLEASE NOTE THE FOLLOWING:

PCIe 1 Lane Cable plugs are keyed with a single groove along one wide
side of the plug. The plug must be inserted into the socket with the
groove aligned properly.

Connect into your Slave Acquisition Modules from the correct channel
groupings on the 9xxMZi-A Master Acquisition Module; meaning, your
first Slave Acquisition Module is connected from the CHANNEL 5-9 output,
second from the CHANNEL 9-12 output, third from the CHANNEL 13-16
output, and last from the CHANNEL 17-20 output.

If you are connecting less than 4 of the Slave Acquisition Modules, the
PCIe 1 Lane Channel Sync Outputs on the back of the Master Acquisition
Module may not be skipped and must be connected in consecutive order
into the PCIe 1 Lane Channel Sync Inputs on the back of the corresponding
slaves.

Advertising