5.9. POWER (POWER)

Measured appliance is supplied by mains voltage applied to schuko test socket. Switching the voltage
on/off as well as selection of phase position is done by internal switch of the tester.

5.9.1. POWER DISPLAY EXPLANATION

Adjustable/selectable parameters:

TIMER - measurement time

00:05

 60:00, resolution 1 s

LIMIT - limit value of apparent power

6 VA

 5.06 kVA

L POS - position of phase terminal on schuko socket

LEFT or RIGHT

Figure 36

: Display with POWER test result

1 ..... Selected function.

2 ..... Progress bar. It follows measurement time during the measurement.
3 ..... Two lines reserved for sub-results as follows: Mains voltages U

L/N

, Load current I

L

, Real power P,

Power factor PF and Leakage current I

PE

.

4 ..... Measurement screen touch-screen key.

5 ..... TIMER touch-screen key to adjust measurement time. Currently selected measurement time is

displayed on the bottom of the key.

6 ..... LIMIT touch-screen key to select limit apparent power. Currently selected value is displayed on the

bottom of the key.

7 ..... L POS touch-screen key to select the position of phase terminal on schuko socket during the

measurement. Currently selected position is displayed on the bottom of the key.

8 ..... Measurement result (in green colour - result OK, in red colour - result not OK).
9 ..... Real time clock (hh.mm.ss).

10 ... Unit of the test result.
11 ... Set measurement time.
12 ... Measurement result status (symbol

in green colour - result OK, symbol

in red colour - result

not OK).