5.12.3. LEAKAGE CURRENT MEASUREMENT ON SCHUKO SOCKET

Measured quantities and display ranges:
Leakage current I

PE

on schuko socket

0.25 mA

 10 A

Mains voltage U

L/N

195

 253 V

1) Select I

LEAK

measurement by pressing the FUNC hard key first.

2) Select SOCKET mode by pressing the MODE touch-screen key first.

3) Check selected limit leakage current by pressing the LIMIT (5) touch-screen key first. Four

independent limit values are available for quicker operations. Select the closest one and modify it

by using the + and touch screen keys if needed.

4) Check selected position of phase terminal on schuko socket by pressing the L POS (6) touch-

screen key. If LEFT position is selected then phase potential is connected to left terminal of schuko
socket and vice versa.

5) Select measurement screen by pressing the

touch-screen key and check all settings again.

6) Connect the UUT to schuko socket according to the figure below.

Figure 45

: Connection of the UUT in I

LEAK

measurement, SOCKET mode

7) Start the measurement by pressing the START/STOP button. The measurement will start to run

and will be stopped after pressing the START/STOP button again. Measurement result will be

currently displayed in green colour

if it is lower than or equal to set limit value

or in red colour if it is

higher than set limit value. Final result will be equipped with green

symbol and with beep-beep

sound if it is OK or wit

h red

symbol and with longer beep sound if it is not OK

. See the display

outlook with test result on the figure 43.

8)

Save the test result by pressing the SAVE hard key twice,

for further instructions see the

“MEMORIZING EXAMPLE” section.

CAUTION

Measurement at both phase positions (phase at left terminal and phase at

right terminal) must be carried out and the highest value must be evaluated.

Switch on the UUT in order total leakage current to be measured!

In case of overloaded test socket the fuse F1 or F2 (both T16A/250V) may

blow.

Do not use test schuko socket except for measurement purpose!

Measurement time (CLAMP and SOCKET) is limited to 60 min!