8 reprocessing determinations, Reprocessing determinations – Metrohm tiBase 1.1 User Manual

Page 313

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

5 How to proceed?

tiBase 1.1

■■■■■■■■

305

Only the currently selected determination as well as all the previous
versions of this determination will be shown in the determination
table
.

7 Select desired determination that is once again to be made the cur-

rent determination version.

8 Click on the symbol or the Determinations Make current

menu item.

The determination version selected in the determination table will
again be made the current determination version. This creates a new
determination, the version number of which is increased by +1 com-
pared with the last version to have been saved.

5.2.8

Reprocessing determinations

How to proceed?

Note

Determinations signed at level 2 cannot be reprocessed.

1 Select Database program part.

2 Click on the symbol or the File Open... menu item.

3 Select desired database or enter name in the Database name field.

The data sets of the selected database are displayed in the Determi-
nation overview
.

4 Select desired determinations.

5 Click on the symbol or the Determinations Reprocess...

menu item.

The Reprocessing dialog window opens. The first of the selected
determinations is displayed.

Modifying variables

1 Select the Variables tab.

Advertising