2 installing bases – Toshiba SX 2000 User Manual

Page 143

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Chapt.4 Installation and Wiring

4.2 Installing bases

Installation

precautions:

(

1

)

B

Because the S2T is not of dust-proof construction, install it in a dust-proof

control panel.

(2) Do not install the bases directly above equipment which generates a large

amount of heat, such as a heater, transformer, or large capacity resistor.

(3) Do not install the bases within 200mm (Sin) of a high-voltage or power cable.

(4) Allow at least 70mm on all sides of the base for ventilation.

(5) For safety during operation and maintenance, install the base as far as is

possible from high-voltage or power equipment.

Alternatively, isolate the base using a steel plate or similar separator.

(

6

)

(7)

(

8

)

(9)

Decide the bases mounting position with considering the length of the expansion

cables.

Install the bases in fully contacting with the mounting frame in order to equalize

the potentials of basic and expansion bases.

In the vicinity of high-voltage and power equipment, it is necessary to give

consideration to grounding. (See 4.5 Grounding)

Install the bases where the power modules are always mounted on the left hand

side, vertically on the mounting frame.

(10) Mount the bases securely, using the base mounting screws of M4 size.

(Screws torque : approx. 1.47N*m=15kgf‘m)

The installation dimensions is as follows.

Type

a [mm]

b [mm]

Weight [g]

Remarks

BU648E

402.5

95

900

BU668

402.5

95

900

BU666

95

850

Under

development

BU664

95

800

1 2 6

Sequence Controller S2T

Advertising