2 periodical checking items – Toshiba SX 2000 User Manual

Page 163

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Check the S2T based on the following points every six months. Also perform checks

when the operating environment is changed.

Chapt.5 Maintenance and Checking

5.2 Periodical checking items

Item

Content of checking

Criteria

Power supply

Measure the voltage of the power (at the ter­

minal of the module)

85 to 264Vac

Check that the terminal screw of the module

is not loose.

Check that the terminal screw

of the module is not loose.

Check that wiring cable is not damaged.

Check that wiring cable is not

damaged.

Installation

condition

Check

that

the

basic

unit

is

installed

securely.

Not loose, no play

Check that the expansion unit is installed

securely.

Not loose, no play

Check that each module is installed securely.

Not loose, no play

Check that each expansion cable connector

is not loose; and the cable is not damaged.

Not loose, no damaged

Programming

Check that the functions of the programming

tool are normal.

Try

executing

simple

opera­

tions.

Check that the connector and the cable are

not damaged.

Not damaged

I/O modules

Measure the voltage of each of the I/O mod­

ules at the terminal block.

The voltage must be within the

specified range.

Check the LED of the input status display.

The LED must light normally.

Check the LED of the output status display.

The LED must light normally.

Check that the I/O terminal block is installed

securely.

Not loose, no play

Check that the terminal screw is not loose

and the terminal has a sufficient distance to

the next terminal.

Not loose, and not contacting

the next terminal

Check that the wiring cable is not damaged.

Not damaged

Environment

Check that the temperature, humidity, vibra­

tion, dust, etc. are within the specified range.

Must be

within the general

specification range.

Program

Check that the content of the S2T program

and the master program (e,g., saved on a

HDD disk) are the same.

Check

that

these

programs

are identical by comparison.

Battery

Check whether the battery must be replaced.

(The installed date is written on the CPU bat­

tery cover.)

Replace the current bettery if

more

than

two

years

has

elapsed.

Check that the connector of the battery is

inserted firmly.

Not loose

1. Turn off power before checking voltage on terminals. Failure to do so can cause electrical

shock.

2. Do not modify the S2T in hardware nor software. This can cause Are, electrical shock or

injury.

146

Sequence Controller S2T

Advertising