V-sft setting, V-sft setting -4 – Hakko MONITOUCH V7 series User Manual

Page 100

Advertising
background image

3

1. 1 : 1 Connection

3-3

Ser

ial Comm

uni
c

a

ti

ons

RS-422/485 Connection

• Connect twist-pair cables between +SD/−SD and +RD/−RD.

• If the PLC has the terminal for signal ground (SG), be sure to connect a wire.

• Connect the shielded cable either to the V7 series or PLC side. This connection

diagram shows the case where the shielded cable is connected on the V7 series side.
When connecting the shielded cable to the V7 series side, connect it to pin 1 of the
connector or the connector case cover.

• To use a terminal block for connection, use Hakko Electronics’ “TC485” optionally

available.

• For the terminating resistance on the V7 series, turn the DIP switch (DIPSW7) to the

ON position on the side towards the rear.

• Twist-pair cables of 0.3 mm sq. or above are recommended.

4-wire system:

2-wire system:

V-SFT Setting

For serial communications, the following settings on the V-SFT editor are required. The
settings in the [Select PLC Type] and [Comm. Parameter] dialogs are shown on the Main
Menu screen of the V7 series. (Refer to “Chapter 2 MONITOUCH Operations.”)

FG

+RD

-RD

+SD

-SD

1

24

25

12

13

SG

7

V7 (CN1)

Signal Name

Pin No.

Shield

To the PLC’s

RS422 port

Receive data (+)

Send data (+)

SG

Receive data (

−)

Send data (

−)

FG

+RD

-RD

+SD

-SD

1

24

25

12

13

SG

7

V7 (CN1)

Signal Name

Pin No.

Shield

To the PLC’s

RS422 port

Send/receive data (+)

SG

Send/receive data (

−)

Advertising