Hakko MONITOUCH V7 series User Manual

Page 158

Advertising
background image

4

1. Ethernet

4-7

Netw

or

k C

o

mm

uni
ca
tio
n

s

• Transceiver

Use the transceiver equipped with the SQE TEST function. (SQE TEST: Signal Quality
Error Test)

Recommended transceiver

* The I/F unit may be broken if the AUI connector is subject to strong force. Use the AUI

cable when connecting the transceiver.

* When the power lamp of the transceiver is not turned on, check the wiring of 12 VDC

power supply, then replace the fuse (refer to page 4-4) of the I/F unit CU-03. For the
replacement procedure, refer to the manual “CU-03 OPERATING INSTRUCTIONS,”
attached to CU-03.

Manufacturer

Type

Allied Telesis

CentreCOM 107

CU-03

V7

PLC

PLC

Maximum segments:

5

Maximum network distance: 925 m
Maximum network nodes:

100 sets

Ethernet

unit

1 segment (max. 185 m, max. 30 nodes)

AUI cable
(max. 50 m)

Transceiver

*2

Terminator

T-type connector

Node

Node

*1

Repeater

Minimum node interval

0.5 m

To extend the segment distance
or increase the number of
nodes, use repeaters.

*1

The unit may have a built-in transceiver.
Refer to the instruction manual for the unit.

*2

12 V power supply is required for each transceiver.

Ethernet

unit

*1

Advertising