Figure 2-6, Oxymitter 4000, Instruction manual – Emerson Process Management OXYMITTER 4000 IM-106-340 User Manual

Page 46

Advertising
background image

Oxymitter 4000

2-8

Instruction Manual

IM-106-340, Rev. 4.0

May 2006

Figure 2-6. Oxymitter 4000 Abrasive Shield Bracing Installation

5. In vertical installations, ensure the system cable drops vertically from

the Oxymitter 4000 and the conduit is routed below the level of the
electronics housing. This drip loop minimizes the possibility that
moisture will damage the electronics (Figure 2-8).

6. If the system has an abrasive shield, check the dust seal gaskets. The

joints in the two gaskets must be staggered 180°. Also, make sure the
gaskets are in the hub grooves as the Oxymitter 4000 slides into the 15°
forcing cone in the abrasive shield.

7. Insert probe through the opening in the mounting flange and bolt the unit

to the flange. When probe lengths selected are 9 to 18 ft (2.74 to
5.49 m), special brackets are supplied to provide additional support for
the probe inside the flue or stack (Figure 2-6).

NOTE
If process temperatures will exceed 392°F (200°C), use anti-seize compound
on stud threads to ease future removal of Oxymitter 4000. For ambient
temperatures that will exceed 185°F (85°C), we recommend the remote
mounted electronics option.

Brace Bars
(Not by Rosemount Analytical)

2.00

(51)

Note: Dimensions are in inches with

millimeters in parentheses.

Vertical brace clamp assy.

Abrasive Shield

Horizontal brace clamp assy.
(Both brace clamp assemblies are the same.
Installation and location of clamp assemblies
and brace bars to be done in field.)

By Rosemount Analytical

}

2 Holes - 0.625
(16) Dia for
0.50 (12) Dia
Bolt

Note: Bracing is for vertical and horizontal Oxymitter 4000

1.00
(25) Max

0.375

(10)

1.00
(25)

4.12

(105)

4.12

(105)

60 Max

o

30

o

5.62

(143)

5.62

(143)

36.00 (914)

Installation. External bracing required for 9 ft. through 18 ft.
(2,75 m through 5,49 m) probes as shown above.

36920003

Min

Advertising