Verify installation, Mechanical installation, Terminal block wiring – Emerson Process Management OXYMITTER 4000 IM-106-340 User Manual

Page 57: Verify installation -1, Oxymitter 4000

Advertising
background image

Instruction Manual

IM-106-340, Rev. 4.0
May 2006

Oxymitter 4000

http://www.processanalytic.com

Section 3

Configuration of Oxymitter 4000

with Membrane Keypad

Verify Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-1
Logic I/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-5

VERIFY INSTALLATION

Mechanical Installation

Ensure the Oxymitter 4000 is installed correctly. See Section 2: Installation.

Terminal Block Wiring

1. Remove cover (27) to expose terminal block (25).
2. Check the terminal block wiring (Figure 3-1). Be sure the power,

4-20 mA signal, and the logic outputs are properly connected and
secure. To avoid a shock hazard, the power terminal cover must be
installed. For units with remote electronics, check the terminal block
wiring at the probe and at the remote electronics unit.

3. Install housing cover (27, Figure 9-3 or Figure 9-4) on terminal block

(25).

Install all protective equipment covers and safety ground leads before equipment startup.
Failure to install covers and ground leads could result in serious injury or death.