Is-is configuration task list – H3C Technologies H3C S5560 Series Switches User Manual

Page 155

Advertising
background image

139

RFC 2966, Domain-wide Prefix Distribution with Two-Level IS-IS

RFC 2973, IS-IS Mesh Groups

RFC 3277, IS-IS Transient Blackhole Avoidance

RFC 3358, Optional Checksums in ISIS

RFC 3373, Three-Way Handshake for IS-IS Point-to-Point Adjacencies

RFC 3567, Intermediate System to Intermediate System (IS-IS) Cryptographic Authentication

RFC 3719, Recommendations for Interoperable Networks using IS-IS

RFC 3786, Extending the Number of IS-IS LSP Fragments Beyond the 256 Limit

RFC 3787, Recommendations for Interoperable IP Networks using IS-IS

RFC 3847, Restart Signaling for IS-IS

RFC 4444, Management Information Base for Intermediate System to Intermediate System (IS-IS)

IS-IS configuration task list

Tasks at a glance

Configuring basic IS-IS

:

(Required.)

Enabling IS-IS

(Optional.)

Configuring the IS level and circuit level

(Optional.)

Configuring P2P network type for an interface

(Optional.)

Configuring IS-IS route control

:

Configuring IS-IS link cost

Specifying a preference for IS-IS

Configuring the maximum number of ECMP routes

Configuring IS-IS route summarization

Advertising a default route

Configuring IS-IS route redistribution

Configuring IS-IS route filtering

Configuring IS-IS route leaking

Advertising
This manual is related to the following products: