Network requirements – H3C Technologies H3C S5560 Series Switches User Manual

Page 34

Advertising
background image

18

Summary Count : 0

The output shows that Switch A communicates with Switch B through VLAN-interface 10. Then the link

over VLAN-interface 10 fails.
# Display static routes on Switch A.

<SwitchA> display ip routing-table protocol static

Summary Count : 1

Static Routing table Status : <Active>

Summary Count : 1

Destination/Mask Proto Pre Cost NextHop Interface

120.1.1.0/24 Static 65 0 10.1.1.100 Vlan11

Static Routing table Status : <Inactive>

Summary Count : 0

The output shows that Switch A communicates with Switch B through VLAN-interface 11.

BFD for static routes configuration example (indirect next hop)

Network requirements

Figure 4

shows the network topology as follows:

Switch A has a route to interface Loopback 1 (2.2.2.9/32) on Switch B, with the output interface
VLAN-interface 10.

Switch B has a route to interface Loopback 1 (1.1.1.9/32) on Switch A, with the output interface
VLAN-interface 12.

Switch D has a route to 1.1.1.9/32, with the output interface VLAN-interface 10, and a route to
2.2.2.9/32, with the output interface VLAN-interface 12.

Configure the following:

Configure a static route to subnet 120.1.1.0/24 on Switch A.

Configure a static route to subnet 121.1.1.0/24 on Switch B.

Enable BFD for both routes.

Configure a static route to subnet 120.1.1.0/24 and a static route to subnet 121.1.1.0/24 on both
Switch C and Switch D.

When the link between Switch A and Switch B through Switch D fails, BFD can detect the failure

immediately. Switch A then communicates with Switch B through Switch C.

Advertising
This manual is related to the following products: