2 installation, 2-1 installation to the operation panel – Omron NT-series Programmable Terminal V022-E3-1 User Manual

Page 41

Advertising
background image

Caution

Caution

Note



%  

Section 2-2

3-2

Installation

Install the NT600S to the operation panel and connect the power to the NT600S as
described below.

Select a proper location referring to Appendix D Installation Environment (page
262).

Always switch OFF the power before assembling equipment or connecting
cables. Otherwise you could sustain an electric shock or equipment could be
damaged.

3-2-1

Installation to the Operation Panel

The NT600S can be flush mounted to an operation panel.

Use the panel fittings and tools included in the product package and follow the pro-
cedure below.

During work at the panel, take care to ensure that no metal scraps enter the unit.
Otherwise, the product may malfunction.



The thickness of applicable operation panel is 1.6 mm to 4.8 mm.



All fittings must be tightened uniformly to a torque of 0.5 to 0.6 N



m in order to

ensure water- and dust- resistance. The panel must not be soiled or warped,
and must be able to support an installation that will remain secure and strong.

(1) Open a hole, shown below, in the panel and install the NT600S from the front

side of the panel.

180.5

263.5

+0.5 mm

0 mm

+0.5 mm

0 mm

(2) Attach the panel fittings at four positions for the upper/lower sides and at two

positions for the right and left sides, shown below, on the rear side of the
NT600S.

Fit the hook of the fitting in the square hole in the body and tighten the screw
with a Phillips head screwdriver while lightly pulling the fitting.

Advertising