4 control system configuration, Control system configuration, Commissioning – Lenze 931K User Manual

Page 27

Advertising
background image

Commissioning

Control system configuration

6

l

27

KHB 13.0004−EN 2.1

6.4

Control system configuration

The control system must be configured before communication with the controller is
possible.

Installing the device data base file (*.GSE)

For the configuration you have to install the device data base file "931E0A6D.GSE" on the
master.

1. Download the GSE file from the Internet.

– You can find the GSE file in the "Services & Downloads" area at

http://www.Lenze.com.

2. Install the GSE file.

– Installation notes are given in the documentation for the master and in the

documentation for the configuration tool.

Creating a project

ƒ

Please refer to the documentation for the configuration tool if you want to create a
project.

)

Note!

Use of data consistency

ƒ

We recommend to use exclusively configurations with consistency to avoid
data conflicts between the PROFIBUS−DP master and the CPU of the control
system.
– If the telegram has, for instance, a length of 8 bytes of data, the PLC must

be able to process the 8 bytes of data continuously (consistently).

ƒ

Detailed description of consistency: (

18)

ƒ

Please note that the processing of consistent data varies between different
control systems. This must be considered in the configuration tool.
– It may be necessary to use system functions of the PLC to ensure the data

consistency.

– Please refer to the documentation for the PLC to find out which data

length can be processed consistently by the CPU.

Advertising
This manual is related to the following products: